Pre-Wire Checklist & Consultation

A pre-wire consultation converts room uses and technology goals into decisions that can be built before insulation and drywall remove access. We review architectural, reflected-ceiling, electrical, lighting, millwork, security, and landscape information together, because a cable location that looks reasonable on one sheet may conflict with a duct, pocket door, shade pocket, or finished cabinet on another.

The output is a field-oriented checklist and decision record, not a generic list of places to add Cat6A. It identifies endpoint purpose, cable and pathway needs, back boxes, blocking, power coordination, service clearances, and unresolved selections. Builders gain a reviewable rough-in basis; owners retain flexibility through deliberate spare cabling and conduit rather than indiscriminate wire.

What we deliver

  • Room-by-room endpoint matrix for WiFi, displays, audio, cameras, door stations, shades, controls, work areas, and future-use positions
  • Plan overlay showing home-run destinations, equipment-rack location, accessible pathways, sleeves, conduit, and pull-box coordination
  • Back-box and mounting schedule with device intent, elevation reference, orientation, blocking, and separation from line-voltage equipment
  • Cat6A, speaker, control, coaxial, and fiber media recommendations based on distance, bandwidth, power, environment, and likely equipment
  • Access-point placement review accounting for ceiling geometry, construction materials, usable coverage, service access, and hardwired backhaul
  • AV rough-in checks for display centerlines, speaker geometry, Dolby Atmos positions, source pathways, projection throw, and equipment ventilation
  • Pre-close verification checklist for labels, slack, protection, bend radius, firestopping responsibility, photographs, and cable testing

How we approach it

DESIGN

We interview the owner and project team about room use, device counts, internet service, automation, surveillance, lighting control, shades, audio/video, and likely future changes. Plans are overlaid and conflicts are marked against ceiling, electrical, mechanical, and millwork information. The rack or enclosure is checked for space, ventilation, power, pathway access, and growth. Instead of naming products prematurely, we define endpoint and performance intent: for example, a hardwired ceiling access point, a 4K display path, or a keypad location coordinated with the lighting design.

PROGRAM

The findings become a pre-wire matrix, marked plans, back-box schedule, and open-decision log. Each pull receives an origin, destination, cable type, service intent, and labeling convention. Conduit is recommended where formats may change or where replacement access will be poor; spare cable is used only where it has a credible destination. Notes distinguish requirements from alternates and owner allowances. We also establish review milestones, because shade wiring, camera views, and AV locations often depend on selections that are not final at the first consultation.

INSTALL

The consultation package is issued before rough-in and reviewed with the GC and the contractor performing the cabling. Field questions are resolved against actual framing, and revised details are documented rather than passed verbally. The installing party remains responsible for code-compliant means and methods, permits where required, listed assemblies, firestopping, and protecting cable from other work.

TEST

Before walls close, the checklist is used for a room-by-room observation. We verify that expected pulls are present and labeled at both ends, boxes are at coordinated elevations, service loops are controlled, pathways remain accessible, and cables have not been crushed, sharply bent, stapled, or placed where finish hardware will damage them. Photographs and correction notes are indexed by room and plan reference. Cable performance testing is specified separately from visual readiness; where requested, results are tied back to the same outlet and panel identifiers.

Frequently asked questions

When should a pre-wire consultation happen?

Begin during design development, while ceiling plans, millwork, lighting, and equipment-room requirements can still change without field rework. The package should be substantially resolved before low-voltage rough-in, then checked again after framing and before wall close. Starting after electrical rough-in is still useful, but it may constrain keypad groupings, display power, rack circuits, and shared pathway options. The most valuable consultation is early enough to influence drawings and late enough to reflect credible room layouts.

Does every technology location need Cat6A?

No. Cat6A is appropriate for many networked endpoints and supports 10-gigabit Ethernet within its channel limits, but speaker circuits, shade controls, contact closures, video, and specialty sensors may require different media. Distance, PoE load, environmental rating, connector strategy, and manufacturer requirements all matter. We assign cable by function and provide conduit where the future signal format is uncertain, rather than treating one cable category as a universal substitute.

Can the consultation remain useful before final equipment brands are chosen?

Yes. Good rough-in documents define performance, mounting, power, pathway, and serviceability without forcing every final SKU. A ceiling location can be reserved for a hardwired WiFi access point; a display position can receive power, data, backing, and a service path; a rack can be sized from device and thermal allowances. Brand-dependent requirements are tracked as decisions with due dates, so Control4, Savant, Lutron RA3 or HomeWorks QSX, and AV choices can be incorporated before their specific wiring becomes critical.